
Check transformer solar headroom.
Under KSERC regulations, rooftop solar injection is permitted up to 90% of your distribution transformer (DTR) rating. Follow the guide to check real-time transformer headroom on KSEB's official portal.
- Find your consumer number and electrical section on your KSEB bill.
- Open the reCap portal and enter them to see your transformer’s remaining solar capacity.
- No headroom? We file for augmentation, use zero-export, or arrange a feeder transfer.
wss.kseb.in
Open the reCap portal
See what your system includes.
Every system uses Tier-1, quality-certified components. Here is how they connect into your KSEB meter, and exactly what goes on your roof.
Cut your KSEB bills by up to 90%.
Under the PM Surya Ghar Muft Bijli Yojana, residential installations in Kerala receive direct bank transfer subsidies with rapid payback. We handle the paperwork.
How the subsidy worksOur installation process.
From first shadow audit to KSEB net-meter sync, we manage every step with certified in-house engineers.
Site & Shadow Audit
Onsite 3D solar irradiance modeling on your RCC terrace.
System CAD Design
Single Line Diagram (SLD) & KSEB paperwork.
Certified Installation
Heavy-duty GP structure & 10-12° South tilt.
Testing & Net Metering
Megger test, earth check (<5Ω), DISCOM sync.
Power Your Home & App
Monitoring app on your phone & a 5-year system warranty.
Learn more: Quality & Safety Standards
Zero Terrace LeakageWe anchor with EPDM chemical gaskets to safeguard concrete roofs.
Wind ResistanceKerala monsoons demand structural certification up to 150+ km/h wind speeds.
Surge ProtectionType-2 SPDs in both AC and DC switchgear plus dedicated copper lightning arresters.
See exactly what our quote looks like.
This is a real 3 kW proposal we prepared for a Kerala home, with the customer's name and address and our bank details removed. Its six pages cover the components and makes, the price, KSEB fees, payment terms, timeline and warranty.
Why Suryavamshi?
Your panels carry a 25-year performance warranty, so we engineer every roof without cutting corners.
In-House Engineering
Directly employed solar technicians. No third-party sales brokers or sub-contractors.
3-Pit Chemical Earthing & LA
Dedicated bentonite pits (<5Ω resistance) and copper lightning arresters for surge protection.
KSEB Feasibility & DTR Liaison
End-to-end management of transformer headroom permits, net-meter installation, and Soura portal sync.
25-Year Panel & 5-Year System Warranty
Panels keep at least 90% output at 10 years and 80% at 25 years. Inverters carry the maker's 5–10 year warranty. Free inspection visits during the warranty.
Rooftops we design for.



Got questions? We have answers.
Still unsure? Call +91 9061626868 and talk to an engineer directly.
What size solar system do I need for my home?
How much terrace space is required?
How do I get the ₹78,000 PM Surya Ghar subsidy?
What if my KSEB transformer has zero headroom?
How long does solar panel installation take in Kerala?
How does rooftop solar generation work during monsoon weather in Kerala?
Will solar panels work during a power cut?
What maintenance is required for residential rooftop solar panels?
